El Dorado Springs Gymnasium Addition

El Dorado Springs Gymnasium Addition


Client

El Dorado Springs R-II School District

Location

El Dorado Springs, MO

Scope

$5,200,000
23,700 sf

One problem identified through the pre-design process was the dissatisfaction with the existing entrance and determined that a new "front door" needed to be a part of any future addition. Utilizing the change in elevation between the existing building and street, we established a new entrance plaza that includes poured concrete tiered seating and a generous site stair that welcomes visitors as they approach, giving the high school a new image and street presence.

The new addition's south wall is fully glazed allowing views into the new gym as well as natural light, creating a welcoming feeling for visitors as they approach. Housing the new band and choir rooms as well as new locker and weight rooms on the ground floor connecting to the new gym.

Home | Contact | Projects • Springfield, Missouri + Kansas City, Missouri | 1-833-518-4545 • ©2019 Dake Wells Architecture | Powered by Tension Group

Log in with your credentials

Forgot your details?